Bukit Panjang Centre Renewal

The smallest will become a clan, the least one a mighty nation; I, the Lord, will hasten it in its time.

— Isaiah 60:22

We thank God for almost 30 years for Covenant EFC at Bukit Panjang, since we moved into 10 Jelapang Road in September 2000. With the growing needs of the congregation and our desire to foster deeper connections with the community as we look forward to the next lease of 30 years, we have embarked on this major renovation (Additions & Alterations) project from 2026 to 2028.

The renewed BPJ Centre will have about 60% more space compared to the original building, enabling us to better fulfil the mission to disciple the generations, Singapore, and the nations.

Frequently Asked Questions

1. Why don’t we tear down the building and rebuild everything?

A full teardown and rebuild would be significantly more costly and less environmentally sustainable. The existing main structure and sanctuary are structurally sound; demolishing them would generate substantial construction waste and embodied carbon. By renovating and building around the existing structure, we can reuse what is already sound, reduce waste, and gain additional space in a more financially responsible and environmentally sustainable way.

Since June 2026, English and The Next Generation (TNG) services have relocated to ACS Independent, while Chinese and Hokkien services have moved to a Korean church at Gangsa. The renovation is expected to take about two years, with completion and return projected around mid-2028. Details of our current locations can be found here.

We will have 60% more space. The original building was built to a plot ratio of 1.0 on a plot of 3,000 sqm as this was the maximum allowed then. New regulations now allow us to build to a 1.6 plot ratio, which means 4,800 sqm of space in total.

The new building will provide a greater number of worship spaces—including a larger capacity sanctuary, more rooms, new mid-sized chapels, and a new 400-seat multi-purpose hall (MPH)—to support concurrent services such as Youth, Mandarin, All Nations, Filipino fellowship, and others.

Only the top floor can structurally support a large, pillar-free hall, which is important for visibility, flexibility, and multipurpose use. If a 400-seater hall were placed on a lower level such as Level 2, structural pillars would be required in the middle of the hall to support the weight of the floors above, significantly reducing sightlines and usability.

To ensure safety and accessibility, the new design includes two large-capacity lifts (about 24 pax each), replacing the current single smaller lift. This greatly improves daily circulation and evacuation capability, including for elderly members and wheelchair users.

The renovated building is designed to support multiple congregations and concurrent services. Support spaces during overlapping services may be tight, but some flexibility exists, including rooms near the Level 4 staff lounge, close to the Level 5 MPH. Dedicated rooms are also planned for fellowships such as the Filipino congregation.

Security will continue to be robust. Measures include 24-hour security (which we have always had), CCTV, good lighting, and closable gates restricting access to upper levels after hours. While Level 1 is designed to be more open and welcoming, upper levels will remain secured.

In addition, not all the walls will be demolished. Two sections of the existing perimeter wall—the side facing the HDB flats and the side facing the multi-storey car park—will be retained for safety reasons due to the significant level differences between the church grounds and the adjacent roads.

The ground-level and common spaces are intended to be welcoming, functional, and relational. We received feedback for quieter areas for conversations, benches with power points and fans, storage options, small reading corners, and clearer wayfinding (such as directional maps) and will take them into consideration during detailed design.

The new coffee corner is intended as a hospitality space, not a full commercial café. Design details such as display cases, sinks, power points, and security shutters are being explored. Operationally, it is unlikely to function as a full-fledged café due to licensing constraints.

Level 1 serves as the main integration point. St Luke’s main walkway leads directly into the church’s lift lobby area, creating natural interaction. There is potential for shared community and active-ageing activities in the future, and a connecting walkway allowing the public to walk in between the two buildings has been built by HDB.

Operating a childcare centre has become significantly more expensive due to the recent removal of government subsidies for childcare centres operating on religious premises. To keep childcare affordable, NLCS now operates centres at subsidy-eligible locations. The BPJ centre will instead host NLCS after-school student care services on the new fourth floor rooms.

Operational matters—including coffee corner (hospitality) operations, MPH usage for sports activities, turnaround between services, furniture movement, and long-term flooring durability—will be worked out in later planning stages once the project is at a later stage.

Download this Building Fund QR Code  and upload it to your banking app via your gallery/album. 

Download this General Fund for East QR Code  and upload it to your banking app via your gallery/album. 

Download this General Fund for WDL QR Code  and upload it to your banking app via your gallery/album. 

Daily Devo
Daily Devotional Journal
Sun, 31 December 2023

Sunday Journal

Past Week’s Review
  • What was my high point and my low point for the week?
  • What gave me life and what drained me?
  • How was the Spirit of God at work?
Reflect

What is one key thing that God said to me this week in light of what has happened?

Respond

What is one thing I need to do in light of what God is saying?
Commit in prayer.

Download this New Life Fund QR Code  and upload it to your banking app via your gallery/album. 

Download this General Fund for BPJ QR Code  and upload it to your banking app via your gallery/album. 

This website uses cookies to ensure you get the best experience on our website.